The energy is the total power consumed and utilised by the load at a particular interval of time it is used in domestic and industrial ac circuit for measuring the power consumption.
Three phase ct energy meter connection diagram.
3 phase supply standard connection for 230 400v 4 wire ct meter installation and test block pdf 0 27 mb 3 phase supply with 1 controlled phase pdf 0 21 mb 3 phase supply with 2 24 hour phases and one controller phase for distributed generation pdf 0 11 mb.
The meter which is used for measuring the energy utilises by the electric load is known as the energy meter.
The meter is for lv or hv three phase user.
In this video we explain 3 phase kwh meter connection with ct operated basically this type of kwh meter is use for ratting ratting load because to direct me.
The energy meter wiring connection is same as i shown in the diagram.
The smaller middle terminal is for a voltage connection from that phase 7 check the rst indicator this should be on if it is off one or more phase voltages is missing if it.
In diagram i shown read yellow and blue for lines and black for neutral and shown all cables in single core but in real life use the 4 core or 4 wire cable for 3 phase kwh meter.
5 connection diagram fig 5 1 ct connection.
Three phase energy meter for hxe310 ct ctpt meter hexing electrical co ltd.
Three current transformer installation with ammeters for three phase supply the connection of ct is to easy and the best place of installation of ct in electric power panel board is to connect it with incoming supply wires and connection.
Meter installation manual hxe310 10 18 fig 5 2 ct pt connection 6 dimension.
The meter is less expensive and accurate.
If the 4 core electric cable is not available you can also use the single core cables or double.